Spine SRS

Innehållsförteckning

History Support

Optimization Steps



The flow chart above explains how the optimization steps work in detail.

*Slider or dose shaper settings.

**Only if plan is loaded.

***Optional loading/saving point.

****Continue can be used with different or the same slider positions or Dose Shaper settings and can be executed as many times as required to reach a good plan.

Art-No. 60919-40EN

Utgivningsdatum: 2019-05-22